Invitation to Bid

This is applicable for building and structure constructions. It is also for short time events like All Soul's Day, concerts, rallies and the like and other temporary construction and repair works.

Temporary Application
Title
Created Date
Status
Paid Work Order Transformer Installation Works 2024
10/03/2024
OPEN
2025 APDU Consolidated Requirements - Steel Poles
10/02/2024
OPEN
Line Upgrade Suawan to Marilog (Phase 1 to 3), Line Upgrade Suawan to Marilog (Phase 4 to 7)
09/30/2024
OPEN
Fabrication & Erection of 69 kV and 13.8 kV Steel Structure for Ecoland 50 MVA Substation
09/26/2024
OPEN
Site Development for Ecoland 50 MVA Substation and Construction of New Control Building at Ecoland 50 MVA Substation
09/27/2024
OPEN
Fabrication and Installation of Equipment Labels at Lanang Substation
09/24/2024
OPEN
2024 Christmas Decoration for Rondez and Ponciano Facade
09/24/2024
OPEN
Davao Light Requirements for Underground Distribution System (UDS) - Various Wires
09/24/2024
OPEN
Renovation of Don Ramon Substation Control Building and Guard House, including Oil Trap Construction
09/18/2024
OPEN
Rotten Pole Replacement (Package 8) and Small Wires Upgrading (Package 9 & 10)
09/14/2024
OPEN
Network Switches and PoE Injector
09/12/2024
OPEN
Testing and Commissioning of 138 Kv Equipment and Secondary Devices at Gatungan Steel 138 Kv Switching Station
09/11/2024
OPEN
Line New, Lanang Feeder 1 and 2 Line Construction, Line Stringing, and Line Upgrading
09/03/2024
OPEN
Line New, BKL 7/BKL 2 going to TUG 1 (via BKL-ULAS bypass connecting to TUG 1) (Package 2)
09/03/2024
OPEN
Line New, GREDU 3 (Package 2 - Line Stringing; 1.4 ckt-km; Double Circuit)
09/03/2024
OPEN
Line New, GREDU 3 (Package 3 - Line Stringing; 2.6 ckt-km; Single Circuit)
09/03/2024
OPEN
Install 1 Set - AVR for MAT 3
09/03/2024
OPEN
Line New, Digos Line, Toril SS to Binugao SS (Line Stringing Package 4)
09/03/2024
OPEN
New 69 kV Davao Line 1 from Matina SS to McArthur Highway (With upgrading of existing 69 kV line from 336 MCM to 795 MCM)
09/03/2024
OPEN
Davao Light Requirement for Various Equipment
08/22/2024
OPEN
PNB SS _ Fabrication and Installation of SEIL Labels for Gredu Substation
08/22/2024
OPEN
Project Aktiv - Implementation and Systems Integration of Enterprise Asset Management
08/29/2024
OPEN