top of page
dlpc-banner-01.png

Invitation to Bid

This is applicable for building and structure constructions. It is also for short time events like All Soul's Day, concerts, rallies and the like and other temporary construction and repair works.

Temporary Application
Title
Created Date
Status
Distribution Transformer for Underground Distribution System (UDS) and Drop Out Recloser Requirements
07/18/2025
OPEN
DAVAO LIGHT VEHICLE REQUIREMENTS
07/18/2025
OPEN
PREYES BAY 2 - MIGRATION OF T1 TO BAY 2 CONTROL WIRING AND PROTECTION
07/17/2025
OPEN
VARIOUS LINE PROJECTS
07/16/2025
OPEN
Implementation of Protection, Control, Metering and SCADA Wiring for Ecoland 50 MVA Substation
07/13/2025
OPEN
Meter Installation and Replacement
07/12/2025
OPEN
Fabrication and Assembly of Elevated Meter Center (EMC) Frame
07/06/2025
OPEN
WIRE REQUIREMENTS
07/04/2025
OPEN
FOC Works
06/20/2025
OPEN
UDS R. Magsaysay Phase 2 Electrical Works
06/18/2025
OPEN
Concreting of Roadway Network at Midland, Maa
06/15/2025
OPEN
GENERAL PEST CONTROL FOR DAVAO LIGHT OFFICE FACILITY (ONE YEAR DURATION)
06/15/2025
OPEN
PROCUREMENT OF CURRENT AND POTENTIAL TRANSFORMERS AND ELECTRICAL TOOLS
06/03/2025
OPEN
REPAIR AT RONDEZ WATERLINE
06/02/2025
OPEN
INSTALLATION OF MAJOR EQUIPMENT AND BUS WORKS AT PAMPANGA 33 MVA SUBSTATION
05/25/2025
OPEN
LINE CLEARING MANAGEMENT
05/25/2025
OPEN
APDU CONSOLIDATED SUBSTATION EQUIPMENT_2 REQUIREMENT
05/22/2025
OPEN
INSTALLATION OF MAJOR EQUIPMENT AND BUS WORKS AT ECOLAND 50 MVA SUBSTATION
05/20/2025
OPEN
DECOMMISSIONING WORKS OF THE OLD PANABO SUBSTATION
05/13/2025
OPEN
DISTRIBUTION TRANSFORMER SERVICING
05/11/2025
OPEN
CONSTRUCTION OF SITE DEVELOPMENT FOR PAMPANGA SS UPGRADE (4-BREAKER RING BUS)
05/08/2025
OPEN
MMD WAREHOUSE EXTENSION AT MIDLAND MAA
04/26/2025
OPEN
PREVENTIVE MAINTENANCE OF STANDBY GENERATORS
04/22/2025
OPEN
2025 - 2nd BATCH APDU CONSOLIDATED DISTRIBUTION TRANSFORMER REQUIREMENTS
04/22/2025
OPEN
APPLICATION SERVICES
04/07/2025
OPEN
UDS R. MAGSAYSAY PHASE 2 - REROUTING OF PRE7 OVERHEAD LINES
04/05/2025
OPEN
SAFETY ZONING AND SUBSTATION REPAIR WORKS
04/05/2025
OPEN
AIR CONDITIONING/MECHANICAL WORKS
04/05/2025
OPEN
Contact Center Partner Project
03/26/2025
CLOSED
SOD CAPEX PROJECT
03/25/2025
OPEN
DESIGN AND PROJECT MANAGEMENT OF DAVAO LIGHT'S NETWORK CAPEX PROJECTS (CIVIL WORKS ONLY)
03/25/2025
OPEN
Communication Cloud Platform
03/24/2025
CLOSED
2025 TREE WIRE REQUIREMENTS
03/19/2025
OPEN
BATTERY MONITORING SYSTEM REQUIREMENTS
03/06/2025
OPEN
APDU CONSOLIDATION TOOLS REQUIREMENTS
03/03/2025
OPEN
POLE HAULING WITH UNLOADING SERVICES FOR MAA
02/21/2025
OPEN
APDU CONSOLIDATED COMMUNICATION EQUIPMENT
02/10/2025
OPEN
APDU CONSOLIDATED REQUIREMENTS - KWHR METERS
02/08/2025
OPEN
APDU CONSOLIDATED INSULATOR REQUIREMENT
02/08/2025
OPEN
APDU CONSOLIDATED SUBSTATION EQUIPMENT REQUIREMENT
02/03/2025
OPEN
APDU CONSOLIDATED CONNECTORS, PLUGS & LUGS REQUIREMENT
01/22/2025
OPEN
APDU CONSOLIDATED LED STREETLIGHT REQUIREMENT
01/20/2025
OPEN
APDU Consolidated Equipment & Lines Requirement
01/14/2025
OPEN
bottom of page